Description



ElSarhaBIM cooperated with EBDAA Office to make the workshop drawings and Buildings Coordination using BIM for the Saudi Arabia Coastguard Facility the project as phase 2 with a built-up area of 4,500 m2 and the total land area is 520,000 m2. The project contains five Projects as phase two an administration building with a gross total area of 2,400 m2, two storage Steel Structured Buildings of 1,200 m2, a marine workshop hanger of 2,150 m2 and the last one the entrance portal 200m2 with the fence 180 m long.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


Other Projects